What Is Included
What the scope actually covers
No vague line items. This is what gets done, and what we will put in writing.
Rough clean
After the trades are largely out: debris removal, sweeping, swarf and offcut clearance, and a first pass so the space is safe to work in and inspect.
Final clean
The detailed pass. All surfaces wiped top to bottom, fixtures and fittings cleaned, labels and adhesive residue removed from glass and appliances, paint specks scraped from floors and glazing, inside cabinetry and drawers, light fittings and vents.
Touch-up clean
Right before handover or opening, after the inevitable last visits from trades. This is the one that decides whether a walkthrough passes first time.
Dust containment
Vents, returns and sills cleaned, because construction dust keeps resettling from them for weeks if they are skipped.
Glass and frames
Stickers, tape residue and overspray removed from windows and doors without scratching the glass.
Floor finishing
New hard floors cleaned of installation residue and, where specified, sealed or finished before anyone walks on them.
Restroom and kitchen commissioning
Fixtures polished, protective film removed, everything brought to a usable standard.
How Often
Getting the frequency right
Project-based. The three-stage rough, final and touch-up sequence is standard on fit-outs and new builds. Small renovations often only need the final and touch-up stages. Book the touch-up as late as your programme allows, because anything cleaned before the last trade leaves gets dirty again.
Pricing
What drives the price
Anyone quoting before seeing the space is guessing. These are the things that actually move the number.
- Square footage and how many floors or units
- Build type, since a restaurant fit-out is far more involved than an open-plan office
- How much debris the contractor leaves behind
- Whether high-level access is needed for ceilings and fittings
- Programme pressure, as compressed timelines mean bigger crews
Who It Is For
Businesses we do this for most
FAQ
Questions we get asked
Straight answers, including when the answer is that you do not need this.
When should we schedule the final clean?
Do you remove construction debris?
How is this priced?
Related
Other services
Most clients combine two or three of these under one contract and one invoice.
Get a Quote
Written scope, flat price, inside 24 hours
Tell us the square footage and your hours and we will come back with exactly what this costs.